IPP261

Integrated Social and Environmental Assessment Study (Volume: 1.2)

Tribal Inclusion and Development Assessment

And Tribal Development Plan




Of

Targeted Rural Initiatives for Poverty Termination and Infrastructure


(ORISSA RURAL POVERTY REDUCTION MISSION)

Submitted To



Director (TRIPTI) - cum Addl. Secy. to Government

Govt. Of Orissa, SIRD Building, Unit-VIII, Bhubaneswar

Submitted By





VARUN TECHNO INFRASTUCTURE PVT. LTD.
N-3/429, IRC Village, Bhubaneswar –751015
Ph/Fax-0674-2559555, Email-mailbox@varuntech.com



Contents


Of 1

Targeted Rural Initiatives for Poverty Termination and Infrastructure 1

Submitted To 1

Submitted By 1

Section One 6

State Scenario 6

1. Introduction 6

1.1 Social assessment summary, Key Findings 7

1.2 Tribal Development in Orissa – State Overview 9

1.3 Tribal Demography 9

1.4 Tribal Operational Holding: 10

1.5 Organization and Association: 10

1.6 Traditional Tribal Governance Mechanisms: 10

1.7 Devolution of Power- Emergence of system of local self-governance: 10

1.8 Strategies for Tribal Development, Orissa: 11

1.9 Tribal Development Programs in Orissa: 11

1.10 Regulations & acts, Protective and anti-exploitative legislations: 12

1.11 Tribal Education: 12

Section Two 13

Study Findings 13

2. Key Findings from the Tribal Development Assessment 13

2.1 Coverage of the study 13

2.2 Methodology – Consultation process 13

2.3 Tribal Demography: 16

2.4 Major tribes 16

2.5 Educational Status of Tribal in Study Area: 17

2.6 Tribal Economy: 18

2.7 Land/asset ownership of tribal: 18

2.8 Livelihood: 19

2.9 Cultural Identify and Social Assimilation: 19

2.10 Accessibility to institutions and government schemes: 20

2.11 Tribal Development Issues: 22

2.12 SHG Intermediation for Tribal Development: 24

2.13 Scope for Tribal Development 28

2.14 Conclusion: 29

Section Three 30

Tribal Development Plan 30

3. Tribal Development Plan 30

3.1 Objective 30

3.2 Project Coverage 30

3.3 Principles 31

3.4 Plan Components 31

3.5 Overall Project Design 32

3.6 Management & Implementation Structure 33

3.7 Key Elements of the Tribal Inclusion and Development Strategy 34

3.8 Implementation Strategies for Tribal Development – Key safeguard measures as part of Project Cycle 35

3.9 Description of the Tribal Development Strategy – according to project components 36

3.10 Additional Provision as Part of the TDP 39

3.11 Legal Entitlement: 40

3.12 Convergence 41

3.13 Operational Arrangements 41

3.14 Monitoring and Evaluation Framework 43

Annexure 1 48

Annexure 2 49

Annexure 3 51

Annexure 4 52

Annexure 5 53

Annexure 6 58

Annexure 7 60

Annexure 8 60

Annexure 9 61

Annexure 10 62

REFERENCES 63




List Of Tables
Table-1 Demography of the Project Area

Table-2 Different indicative Tribal Programs

Table-3 Exclusive Regulation to Protect Tribal Interest

Table-4 Demographic profile of sample villages

Table-5 Major Tribes & Population in Study Villages

Table-6 Literacy status of tribal and other social groups at state level

Table-7 Special educational institutes for tribal in selected study districts

Table-8 Category wise livelihood pattern in the sample villages

Table-9 Specific Tribal Issues in Study Villages

Table-10 Number of Tribal SHGs in sample villages

Table-11 No. of Blocks in ST population range

Table-12 Percentage of tribal by project districts

Table-13 Project Objective and Component Linkage

Table-14 Implementation Strategy as per Tribal Population Range

Table-15 Implementation arrangements, Organisation and Management

Table-16 Key issues for Monitoring and Evaluation of TDP

Table 17 Tribal Development Plan – Components Summary



Download 1.42 Mb.