The World Bank December 2001


PART 2 – Supply Requirements



Download 0.9 Mb.
Page11/13
Date09.08.2018
Size0.9 Mb.
1   ...   5   6   7   8   9   10   11   12   13

PART 2 – Supply Requirements





Section VI. Schedule of Requirements


Contents


Serial number Brief description Quantity Delivery schedule 79

(shipment) 79

in weeks/months from _________ 79

1. List of Goods and Delivery Schedule 80

Schedule of Delivery 80

The delivery schedule expressed as weeks/months stipulates hereafter a delivery date which is the date of delivery (i) at EXW premises, or (ii)to the carrier at the port of shipment when the contract is placed on FOB or CIF terms, or (iii) to the first carrier when the contract is placed on FCA or CIP terms. In order to determine the date of delivery hereafter specified, the Purchaser has taken into account the additional time that will be needed for international or national transit to the Project Site or to another common place of destination. 81

Item number Brief description Quantity Delivery schedule 81

(shipment) 81

in weeks/months from _________ 81

2. List of Related Services and Completion Schedule 82

3. Technical Specifications 83

4. Drawings 84


Serial number Brief description Quantity Delivery schedule

(shipment)



in weeks/months from _________1
1. List of Goods and Delivery Schedule

The Bidder shall quote prices and Contract Delivery Dates for all items and lots as specified in this Form 1 List of Goods and Delivery Schedule.




1

2

3

4

5

Item

Description of Good




Quantity


Physical Unit

Incoterm Specified and Named Place or Port of Destination


Goods from outside the Purchaser’s Country


Goods from inside the Purchaser’s Country



































































































































































Schedule of Delivery
The delivery schedule expressed as weeks/months stipulates hereafter a delivery date which is the date of delivery (i) at EXW premises, or (ii)to the carrier at the port of shipment when the contract is placed on FOB or CIF terms, or (iii) to the first carrier when the contract is placed on FCA or CIP terms. In order to determine the date of delivery hereafter specified, the Purchaser has taken into account the additional time that will be needed for international or national transit to the Project Site or to another common place of destination.2

Item number Brief description Quantity Delivery schedule

(shipment)



in weeks/months from _________3
2. List of Related Services and Completion Schedule

The Bidder shall quote prices and Contract Completion Dates for all items and lots as specified in this Form 2 List of Related Services and Completion Schedule.




1

2

3

4

5

6

Item

Description of Service

Quantity



Physical Unit

Site or Place where Services shall be performed

Required Completion Date for Services






















































































































































































3. Technical Specifications
3.1 The Goods and Related Services shall comply with following Technical Specifications and Standards:


Item No

Name of Good or Related Service

Technical Specification and Standards









































































































































4. Drawings

4.1 This Bidding Document include ____________ drawings.






Download 0.9 Mb.

Share with your friends:
1   ...   5   6   7   8   9   10   11   12   13




The database is protected by copyright ©sckool.org 2020
send message

    Main page