|
M – mapping up and removal of scalawags from the pool of ranks
S
|
Page | 3/9 | Date | 01.12.2022 | Size | 28.22 Kb. | | #88033 |
| PATROLM – mapping up and removal of scalawags from the pool of ranks
S – strengthening the management and capability of PNP to undertake/support the dreamed operation and activities
Three Point Agenda
I – inept
C – corrupt
U – undiscipline
Prevent by moral persuasion or otherwise the resurrection of the inept, the corrupt and the undisciplined police officers.
Re-invent the PNP’s system and procedures to assure everyone a culture of transparency, integrity and honesty, and
Rebuild the police institution into an agency that can find its distinction in the protection of rights and not in their violation
A cure to ICU
A – aptitude
I – integrity
D – discipline
GLORIA
G – graft free organization
L – leadership by example
O – one stops shop mechanism for a faster police response to complaints and reports
R – result oriented- culture in the anti-criminality effort
I – investment climate, which is business friendly as a result of peace and order
A – accountability and ownership of peace and order campaign
SMART
S – simple
M – measurable
A – attainable
R – realistic
T – time bound
SIX STEPS IN PLANNING
Needs assessment
Goal and objective setting
Definition of alternative methods
Cost benefit assessment
Selection of methodology
Definition of evaluation methods
|
The database is protected by copyright ©sckool.org 2023
send message
|
|